CASE STUDY / INDUSTRY
A 2000 m² warehouse. Power without pauses.
Backup power and peak load shaving. A demonstration project.
500 кВтESS power
−18%electricity costs
3,5 годаestimated payback
2000 м²site area
Sample case from the design mockup. Figures are illustrative and are not a promise of results.
The client’s task
Keep the warehouse running during grid outages and cut the load during the most expensive hours.
- Support critical power lines
- Reduce peak power consumption
- Allow for site load growth
Solution contents
One system. Three levels.
01Grid
→02ESS / EMS
→03Loads
Project details
Before and after
| Metric | Before | After |
|---|---|---|
| Critical line power | Grid-dependent | ESS backup |
| Peak management | Not used | Load-schedule based |
| Consumption metering | Single meter | System monitoring |
«What matters most to us is continuous equipment operation and clear consumption control»Customer representative · sample testimonial
Equipment in the project
GAPWERK INDUSTRIAL-100
100 кВт · 215 кВт·ч, шкафная система
On request
Learn more GAPWERK HYBRID-12
12 кВт, трёхфазный
On request
Learn more GAPWERK KIT-MOUNT
Монтажный комплект для домашних ESS
On request
Learn more