Happy Spring and Labour Day!
GAPWERK Technology Research
+86 136 2257 5636Request a quote
CASE STUDY / INDUSTRY

A 2000 m² warehouse. Power without pauses.

Backup power and peak load shaving. A demonstration project.

500 кВтESS power
−18%electricity costs
3,5 годаestimated payback
2000 м²site area

Sample case from the design mockup. Figures are illustrative and are not a promise of results.

The client’s task

Keep the warehouse running during grid outages and cut the load during the most expensive hours.

  • Support critical power lines
  • Reduce peak power consumption
  • Allow for site load growth

Solution contents

Project details

Before and after

MetricBeforeAfter
Critical line powerGrid-dependentESS backup
Peak managementNot usedLoad-schedule based
Consumption meteringSingle meterSystem monitoring
«What matters most to us is continuous equipment operation and clear consumption control»Customer representative · sample testimonial

Equipment in the project

Let’s discuss your site

Calculate the project

The request goes to a GAPWERK manager — we reply within a business day.